Kitchen Renovations Salisbury

A Better Kitchen for Your Salisbury Home

There are two very different ways to get a better kitchen in Salisbury. You can renovate the existing kitchen in your post-war home, or you can raise the house and build a brand-new kitchen underneath as part of a raise and build under. Which one makes sense depends on your home, your block, your flood information and how much extra space your family needs. If you are getting the house ready for the next 10 or 20 years rather than selling, it is worth weighing up both before you commit.

Bishop Construction Services has been a family builder in Greenslopes since 2004, and house raising and build-under projects are one of our signature services. We are QBCC licensed (1074234) and full members of Master Builders Queensland. You deal directly with Barney from the first visit to handover.

20+Years renovating Brisbane homes
2004Family owned since
2 pathsRenovate in place, or raise and build under
1 builderOne contract and one contact for every trade

QBCC Licence 1074234 | Full member, Master Builders Queensland | Free, obligation-free quote

Salisbury by the Numbers

Salisbury sits about 12 km by road south of the Brisbane GPO. It was mostly rural until the Second World War, when the Rocklea Munitions Works opened in 1941, and housing grew strongly after the war and again from the 1960s. Today it is a suburb of family homes with a large share of owners paying off a mortgage, which is exactly where a kitchen upgrade or a build-under tends to happen.

89.1%Of occupied homes are separate houses, compared with 74.8% across Queensland
44.5%Of homes are owned with a mortgage, compared with 34.4% across Queensland
35Median age of residents, compared with 38 across Queensland

Separate Houses as a Share of Homes

Salisbury: 89.1%
Queensland: 74.8%

Couple Families With Children

Salisbury: 46.7%
Queensland: 41.2%
2021 Census Salisbury Queensland
Population 6,790 About 5.16 million
Average people per household 2.7 2.5
Homes with four or more bedrooms 35.1% 38.8%
Owned outright 23.9% 29.1%
Rented 30.0% 33.1%
Median weekly household income $2,133 $1,675

More people per household and fewer four-bedroom homes than the state average is a common sign that families are outgrowing their space. That is the point where a bigger kitchen in the same footprint, or a whole new level underneath, starts to make sense.

Sources: Australian Bureau of Statistics, 2021 Census QuickStats, Salisbury (Qld) suburb; Wikipedia, Salisbury, Queensland.

Renovate in Place or Raise and Build Under?

Factor Renovate in place Raise and build under
Scope The kitchen, sometimes a wall Lifting the house, a new lower level and a new kitchen
Approvals Generally only for structural changes Building approval, and possibly more depending on overlays
Living arrangements Usually stay home with a temporary kitchen Generally move out during the lift and main build
On-site time Weeks for a straightforward kitchen A much longer project, after design and approvals
Relative cost Lower Much higher, but adds a whole new level
Best for Families happy with the size of the house Families who need more room and want to keep the yard

If raising is not right for your home, we will say so and focus on getting the best kitchen possible from the existing layout.

Updating Kitchens in Salisbury’s Post-War Homes

Renovated Salisbury post-war home kitchen with white cabinetry, timber floors and a central island.

Many Salisbury homes are post-war houses, often timber and sometimes highset. Their kitchens tend to be small, closed off and short on storage. An update can be as simple as a better layout inside the same room, or as involved as removing a wall to join the kitchen to the living area. A load-bearing wall needs engineering and generally building approval, which we coordinate.

Expect a few predictable surprises in older homes:

  • !Wiring that has been added to over the decades
  • !Pipes due for replacement
  • !Floors that dip where the old kitchen sat
  • !Walls and corners that are not square, which suit made-to-measure joinery

Spotting these at the first visit keeps the quote accurate. If you plan to stay for many years, think about how the kitchen will work as the household changes. Wider walkways, a second prep area and drawers instead of low cupboards make life easier for everyone, from young children to ageing parents.

Building a New Kitchen as Part of a Raise and Build Under

Here is an option many Salisbury owners have not considered. Rather than renovating the upstairs kitchen, lift the house and build new living space underneath, including a new kitchen that opens straight onto the backyard. The upstairs can then be reworked as bedrooms or a retreat.

Keep the YardGain a whole level of living space without building out over the lawn.
No Second StoreyUse the space under the house instead of adding a level on top.
Higher Living AreasIn some cases, lift the main rooms further above flood exposure, depending on the site and approved design.
A Blank CanvasRoom for a larger kitchen, extra bedrooms, a laundry or better yard access.

House raising requires building approval and may need further approval depending on overlays. Engineering and certification are essential, and you will generally need to move out during the lift and main build-under stage. A good part of the timeline is spent in design and approvals before the house goes up, and our team coordinates the engineers, certifiers and licensed trades throughout.

Checking Flood Information Before Renovating

Some parts of Salisbury are low-lying and close to creeks, so flood information can change the whole plan: where a new kitchen should sit, the minimum floor level for new habitable rooms, and which materials make sense on a lower level. We look at it early, before any design is locked in.

1Search the Flood Awareness MapBrisbane City Council’s online map shows how likely different flood types are to affect your address.
2Download the FloodWise ReportIt includes minimum habitable floor levels and, where available, historic levels from January 2011 and February 2022.
3Decide: Renovate or RaiseUse what you learn to choose between renovating in place and building under.
Worth knowing: Brisbane City Council notes that minimum habitable floor levels do not achieve full flood immunity, and that building higher reduces flood risk further. It is worth checking the higher range of possible flood levels for your property before settling on a design.

Sources: Brisbane City Council, FloodWise Property Reports; Brisbane City Council, Flood resilient building and flood building requirements.

Choosing a Kitchen Layout for a New Ground Floor

Modern ground-floor kitchen in a raised Brisbane home opening onto a leafy backyard.

When a new kitchen goes into a raise and build under, you are designing from a blank canvas, which is exciting and also easy to get wrong.

Plan for Why it matters
Where the stairs land A stair that drops into the middle of the kitchen dictates everything around it
Link to the yard Put the kitchen close to the back door if outdoor living matters to you
Laundry nearby Plumbing and drainage can share runs
Ceiling height Council height rules and flood requirements affect how high the house can go
Natural light Light can be limited under a raised house, so window placement needs care
Posts and structure Custom joinery can work around structural posts instead of fighting them

All of this is worked out in the design and approval stage, before the house goes up.

Gaining Bench Space, Storage and Better Flow

Compact kitchen with deep storage drawers, pull-out pantry and custom white cabinetry.

Small post-war kitchens gain a lot from good planning:

  • ✓Removing a wall to link the kitchen and living area, where engineering allows
  • ✓Running cabinetry towards the ceiling for extra storage
  • ✓Swapping shelved cupboards for deep drawers
  • ✓Adding a pull-out or walk-in pantry
  • ✓Creating an island or peninsula for bench space and seating

Made-to-measure joinery handles awkward corners and unusual room sizes, and quality hinges and drawer runners help cabinetry stand up to daily family use.

Finishes and Cabinetry for Southside Living

Southside kitchens get plenty of sun and humidity. Moisture-resistant cabinet board around wet areas, quality hardware and good ventilation help a kitchen last. Light colours brighten small rooms, while timber tones add warmth. For benchtops, choose from natural stone, porcelain, sintered surfaces, timber or laminate.

Engineered stone is no longer an option. Since 1 July 2024, engineered stone cannot be installed, manufactured, supplied or processed in Queensland.

Source: Queensland Government, Engineered stone ban.

Materials for a Lower-Level Kitchen in a Flood-Affected Area

If the new kitchen will sit on a lower level, some materials recover far better after water exposure than standard board. These usually cost more, so weigh them against your property’s flood information.

Element Standard choice More flood-resilient option
Cabinet carcasses Particleboard or MDF Waterproof cabinetry, such as marine-grade plywood or stainless steel or aluminium frames
Flooring Carpet or floating floors Tiles or polished concrete
Wall linings Standard plasterboard Water-resistant linings such as fibre cement sheet
Cabinet bases Kickboards on the floor Raised plinths that keep cabinet boxes off the floor
Power and appliances Power points at standard height Raised power points and separate upstairs and downstairs circuits
Doors Hollow-core Solid-core

Source: Brisbane City Council, Flood resilient building and flood building requirements.

How to Budget for a Salisbury Kitchen

We never quote without seeing the house. Within either path, these are the factors that move the price:

Cost factor Effect
Size of the kitchen More cabinetry and benchtop
Custom joinery vs standard cabinets Custom costs more but suits uneven walls and odd sizes
Benchtops and appliances Can move the total a long way in either direction
Structural changes Engineering and approval for wall removal
House raising Adds engineering, lifting, certification and building the lower level
Flood-resilient materials Cost more than standard board on a lower level
Hidden issues in older homes Keep some budget aside for what turns up when the old kitchen comes out

Either way, the trade pricing we receive on cabinets, joinery and benchtops is passed on to you, and your first quote is free. A detailed quote should explain which construction activities, materials and specialist services are included.

The $3,300 rule in Queensland: building work valued over $3,300 must be done by a QBCC-licensed contractor, and plumbing, drainage and gas fitting need a licence at any value. Residential work over $3,300 must also be covered by the Queensland Home Warranty Scheme.

Maximum Deposit by Contract Value

$3,300 or less: up to 20%
$3,301 to $19,999: up to 10%
Over $20,000: up to 5%

One exception matters for kitchens: a deposit of up to 20% may be allowed where made-to-measure work done off site, such as custom kitchen cabinetry, makes up more than half of the total contract price.

Sources: QBCC, Deposits and progress payments; QBCC, When you need a licence; QBCC, What is the Queensland Home Warranty Scheme.

Concept to Handover for Salisbury Homeowners

1Free VisitWe measure up, look at the structure and talk through your plans.
2Design and SelectionsLayout, cabinetry, benchtops and finishes are chosen.
3Engineering and ApprovalsSurveying, engineering and certification where the project needs them.
4Detailed QuotePriced upfront before anything is ordered.
5Build and HandoverWe coordinate every trade and walk you through the finished kitchen.

One Licensed Builder From Start to Finish

A kitchen renovation involves cabinetry, plumbing, electrical, tiling and often structural work. A raise and build under adds lifting, engineering, certification and a whole new floor. With one licensed builder managing it all, you have one contract and one contact. You deal with Barney directly, and licensed trades provide compliance certificates for their work.

Teaming Your Kitchen With a Bathroom or Extension

Combining the kitchen with a bathroom or laundry renovation can make scheduling trades more efficient, because plumbing, electrical and finishing work can be coordinated together. If you need more room, an extension or a raise and build under might be the better answer, with the kitchen designed into the new layout and room for an extra bathroom downstairs. For larger projects in the suburb, see our renovation and extension builders in Salisbury page.

Salisbury Kitchen Questions and Answers

Can I stay in the house during the work?
For a standard kitchen renovation, most families stay, with a temporary kitchen set up. For a raise and build under, you generally need to move out during the lift and main build-under stage.
Do you coordinate engineering and certification?
Yes, along with design, drafting and surveying when a project needs them.
How long does a kitchen take?
On site, a straightforward kitchen is a job of weeks. A raise and build under is a much longer project, and much of its timeline is design and approvals. Material lead times also affect the schedule.
How do I check if my Salisbury property is flood affected?
Search your address on Brisbane City Council’s Flood Awareness Map and download a FloodWise Property Report. The report shows flood likelihood, minimum habitable floor levels and, where available, historic flood levels from January 2011 and February 2022.
Can I still get an engineered stone benchtop?
No. Engineered stone has been banned in Queensland since 1 July 2024. Natural stone, porcelain, sintered surfaces, timber and laminate are all available.
Do you work in Salisbury?
Yes. Salisbury is within the southside areas we cover from our base in Greenslopes.

Plan Your Salisbury Kitchen With Us

Whether you want a new kitchen upstairs or a whole new level underneath, talk to Barney on 07 3469 5110 or arrange a free consultation online.

QBCC Licence 1074234 | Master Builders Queensland member | Family owned, 20+ years

Call Barney on 07 3469 5110 Request Your Free Quote

    Contact Us